Winneke Treatment Plant Security Upgrades

The project involves the construction of a new reception area and security access point at the Winneke Treatment Plant offices. This upgrade replaces the existing entry point and introduces an improved parking access, facilitating easier and more efficient access for both the public and office employees to the main offices.

Project Highlights

  • Partnering with a prestigious client to deliver exceptional results that were acknowledged for perfectly aligning with their expectations.

  • Project timelines were established and successfully met.

Services Provided

  • Modifications to the client’s Winneke Treatment Plant Administration building

  • This includes structural, electrical, glazing, and architectural finishing works.

  • Construction of a concrete staircase for access to the new entry point.

  • Landscaping, lighting, and remediation works to complement the new entry point.

  • Installation of new heavy-duty vehicle access gates.

Services Provided

  • Assessment of the condition of the deteriorated carpark and surrounding areas.

  • Collaboration with our client to develop a Request for Quotation (RFQ) for the rectification works, providing expert advice and recommendations on the best approach to address the issues within budget and time constraints. 

  • Implementation of safety measures by cordoning off the affected areas to prevent public access during the works.

  • Carrying out the necessary resurfacing and repairs to the carpark and other high-traffic areas, ensuring a safe and functional environment for the public until the larger capital project is completed. 

Related Case Studies

Water Reservoir Access Platform

Power Station Building Upgrades

Water Utilities Heritage Building Restoration

Challenges

  • Working inside a water treatment plant

  • Site access and entry requirements

  • Demolition works including removal of concrete tilt panels and structural beams.

  • Working within an live office environment.

  • Connections between old infrastructure and new system requirements

Outcome

Enhanced parking and building access have been established for employees, making small package deliveries to the main offices much more convenient. The updated visitor reception kiosk area now includes seating that was previously lacking at the old entry point. Previously, access to the building was through sections of the operational Treatment Plant, which offered limited car parking options near the main entrance.